Analyses of the Flood Wave Propagation in Case of “Nedavic” Dam Breach at the Section From the Dam to the Urban Area of Konjic Investor: EFT HE Ulog d.o.o. Kalinovik     INTRODUCTION Hydraulic analyses, especially those considering process of flood wave propagation in emergency situations for hydro power plants (dam overflow or breach) are very important since enable interpretation of hydraulic features of extreme hazards and risk of flooding the downstream sections of watercourses....
More

STUDY ON DISLOCATION AND EXTRACTION OF MATERIAL FROM THE RIVER BED Ministry of Agriculture, Forestry and Water Management, Public Institution „Vode Srpske“, 2022   During 2022, Zavod za vodoprivredu has developed Studies for dislocation and extraction of material from the watercourses on 47 locations. Locations for the Studies on disposing river sediment are identified by Terms of Reference and selected by river basins based on following numbering:  Sava - 4 locations; Drina - 14 locati...
More

Supervision of Works on Construction of “Usora” Pump Station, Doboj Investor: UNDP BiH Implementation period: 2018-2020   Based on the contract on supervision UNDPBIH-18-161-LID-ZAVODZAVODOPRIVREDU-I, of 30.08.2018 concluded between UNDP BiH and Zavod za vodoprivredu d.o.o. Bijeljina, Zavod za vodoprivredu has performed construction supervision on implemented civil, hydro-technical and electrical works on construction of “Usora” pump station, Doboj. Supervisor, has regularly follow imple...
More

Consultancy Services – Supervision of BNZ-5 Irrigation System Construction on Bijeljina Municipality Territory – Donje Crnjelovo Investor: Ministry of Agriculture, Forestry and Water Management, Agricultural Projects Coordination Units – APCU Supervisor: Consortium Zavod za vodoprivredu d.o.o Bijeljina and Energoprojekt Hidroinženjering a.d. Belgrade is author of the Detailed Design and provides Supervision of Works, i.e of FIDIC ENGINEER (Consultant) Contractor: Consortium „HIGRA d.o.o. Bije...
More

Consultancy Services – Development of the Detailed Design for KOJ-5 Irrigation System in Kojčinovac, City of Bijeljina Investor: HIGRA d.o.o. Bijeljina Implementation: Project implemented in period 2021-2022   Preliminary Design for the area of Semberija has defined spatial units, sub-systems and positions and required profiles of transport and distributive pipelines in the area of all 24 sub-systems, including KOJ-5 as basis for consideration of development of distributive network and c...
More

Preliminary Design and Detailed Design of Waste Water Treatment Plant in Teslic Investor: EIB-Wat-San, Teslić municipality, Higra Expected implementation period: December 2022   Consortium Higra d.o.o. Bijeljina, Zavod za vodoprivredu d.o.o. Bijeljina and Hidrokop Banja Luka engaged in December 2019 on designing and constructing activities on the 1st  phase of WWTP on turn-key principle, based on Yellow Fidic, for the Teslic municipality. This type of contract means that certain knowledg...
More

STUDY ON DISLOCATION AND EXTRACTION OF MATERIAL FROM THE RIVER BED Ministry of Agriculture, Forestry and Water Management, Public Institution „Vode Srpske“, 2020   In 2020, Zavod za vodoprivredu has developed 2 series of Studies on dislocation and extraction of material from the river bed. Most endangered locations of alluvial deposit on Bosna, Drina, Zalomka and Sušica rivers were identified by geodetic surveying and site visits. For the proper and detailed consideration of all hydrolo...
More

Study “Economic Impacts of Climate Changes to Hydro Power Sector in Republika Srpska – Multipurpose Hydropower System of Trebišnjica Investor: UNDP BiH Designers: Energoprojekt   –  Hidroinženjering ad. Beograd & Zavod za vodoprivredu d.o.o, Bijeljina Time of  implementation: October 2019 – June 2020   INTRODUCTION Multipurpose system for use, organization and protection of Trebišnjica river basin – „Trebišnjica“ is one of the biggest and by configuration most complex integrated developme...
More

EXPERT OPINION FOR ACQUIRING – PROLONGING THE WATER PERMIT FOR “VIŠEGRAD” HPP FOR PERIOD 2021-2026 Investor: MH Power Utility of RS, ZP “Hidroelektrane na Drini”, Višegrad Implementation period: 2021-2022   In period from December 2021 till February 2022, Zavod has developed “Expert opinion for acquiring – extension of water permit for Višegrad HPP’s operation in period 2021-2023” which included additional hydrological analyses (development of the new hydrological time series) for Visegr...
More

Study „Hydrological Analyses of Cerničko polje“ Investor: MH Power Utility of RS, Associated company Hydro Power Plants on Trebišnjica, Energoprojekt –Hidroinženjering ad. Belgrade– Time of implementation: March – June 2021   INTRODUCTION During 2021 Contract was signed between MH Power Utility of RS, AC HPP on Trebisnjica  from Trebinje and company Energoprojekt-Hidroinženjering a.d from Belgrade on development of financial and technical documentation under title “Preliminary solution o...
More

Study on Economic Impacts of Climate Changes on Energetic and Agricultural Sectors in Vrbas River Basin Investor: United Nations Development Programme Bosnia and Herzegovina Implementation period: July 2020- September 2021   „Study on economic impacts of climate changes to energetic and agricultural sectors in Vrbas river basin“ consists of seven particular reports pursuant to provisions defined by the Contract, Annexes and Terms of Reference. Reports are submitted and accepted by Invest...
More

Study „Mapping Urban Areas of Bosnia and Herzegovina Under the Torrential Flood Risk and Preliminary Assessment of Protection Measures Application Based on Nature-Inspired Solutions in the Area of the City of Banja Luka and the City of Tuzla” Investor: United Nations Development Programme, BiH Implementation period: November 2021 - March 2022   Introduction Numerous studies dealing with natural hazards imply terrifying statistics saying that natural hazards intensity is increasing over...
More

Study on Possibilities of Use of Trebisnjica District River Basin  for the Fish Cage Farming Investor: MH Power Utility of Republika Srpska, Associated company  Hydro Power Plants on  Trebisnjica Ltd, Trebinje Period of implementation: 2021-2022   Multipurpose system for use, organization and protection against flooding of Trebisnjica river basin is one of the biggest and by configuration most complex integrated development designs in the water sector implemented in the area of South Eur...
More

Preliminary design of irrigation system on agricultural areas in Semberija, Bijeljina municipality (10.000 ha) with Pilot project BNZ-5 irrigation system in Donje Crnjelovo for the area of 500 ha   Preliminary design was prepared for development of irrigation systems for the 10.000 ha of agricultural land in Semberija. Water supply source is the existing channel network. This network abstracts water from the river and transports it to the Sava river. Beside drainage of waters which was p...
More

Training for Integrated Water Resources Management and Climate Change Adaptation in B&H Investor: UNDP B&H Implementation period: 2019 Consortium: Institute for Water Management (IWM), Sarajevo – Consortium Leader, Institute for Water Management (IWM), Bijeljina, and ‘Enova’ Sarajevo The project ‘Integrated Water Resources Management and Climate Change Adaptation in Bosnia and Herzegovina’ consisted of training in three workshops. The first workshop was held in Neum, 17-19 June 2019...
More

Study - Determining Environmental Flow at Seven Profiles of the Neretva and Trebisnjica   Investor: Federal Ministry of Agriculture, Water Management and Forestry, Agency for the Adriatic Sea Basin, Republika Srpska’s Ministry of Agriculture, Forestry and Water Management, Agency for the Trebisnjica River Basin District and Croatian Waters Implementation Period: 2014 Consortium: ‘Elektroprojekt’ Zagreb – Consortium Leader, Institute for Water Management (IWM) Bijeljina and Institute for ...
More

Preliminary and Detailed Designs Improvement of the Left Drina Bank Between the Confluence of the Krizevica and the Confluence of the Glogovska River Including the Construction of Flood Defence Embankment (Institute for Water Management, Bijeljina & CHT Hidropoint, Banja Luka & HEC, Banja Luka, 2020)   The hazard and risk of flooding by the Drina, Krizevica and Glogovska rivers in the project area in the municipality of Bratunac was assessed as high and extremely high according ...
More

Supervision of the Project (Emergency measures for the rehabilitation from flooding – reconstruction and extension of the flood defence system in the Republika Srpska 2016-2019 – Supervision of Phase II     TG11 - Rehabilitacija pumpnih stanica za zaštitu od poplava u Republici Srpskoj (DNP Period)   TG07- WA 108 – Nadvišenje savskog nasipa u Kozarskoj Dubici   TG17-PM949 – Sanacija ruševnih obala rijeke Velike Usore u Tesliću (DNP period)   ...
More

UNDP – B&H Study of Economic Impacts of Climate Change on the Hydropower Sector in the Republika Srpska – the Trebisnjica Multipurpose Hydropower System    (Energoprojekt – Hidroinzenjering, Belgrade & Institute for Water Management, Bijeljina, 2019-2020)   Within this study we carried out basic hydrological analyses for reference profiles of hydropower facilities (existing and planned), followed by detailed hydrological analyses of the impact of climate change in the area ...
More

Update and Innovation of the Republika Srpska’s Erosion Map   (PI 'Vode Srpske', 2006 – 2015)   A large portion of land in the Republika Srpska is affected by erosion processes of varying intensity. Prerequisites for the development of erosion are geological and geomorphological specificities, hydrological, pedological and climatological characteristics, the state of the woodland, and different ways of land use. This project began with activities on collecting relevant data on the E...
More