SUPERVISION OF THE CONSTRUCTION OF HYDRAULIC STRUCTURES

 

  1. Supervision of the Project (Emergency measures for the rehabilitation from flooding – reconstruction and extension of the flood defence system in the Republika Srpska 2016-2019 – Supervision of Phase II (ongoing project)
    (Investor: Republika Srpska Ministry of Agriculture, Forestry and Water Management and PI “Vode Srpske” – EIB loan)1


  2. Design and construction supervision for the irrigation system on 622 ha in Novo Selo, Bijeljina,
    (Investor: Republika Srpska Ministry of Agriculture, Forestry and Water Management – WB loan, 2014)


  3. Design and construction supervision for the irrigation system on 220 ha in Gojkovo and Stakica Polje, Municipality of Pelagicevo,
    (Investor: Republika Srpska Ministry of Agriculture, Forestry and Water Management – WB loan, 2014)


  4. Design and construction supervision for the main wastewater and storm sewers and the access road to the wastewater treatment plant in Bileca,
    (Investor: Municipality of Bileca, 2012)


  5. Design and construction supervision for the wastewater treatment plant in Bileca,
    (Investor: Hydroelectric Power Stations on the Trebisnjica and World Bank, 2010- 2011)


  6. Project Manager – Monitoring of the project “Design and Construction of the Drinking Water Treatment Plant of the Sava River of 330 l/s Capacity”,
    (Investor: Brcko District 2009-2010)


  7. Design supervision of the Final Design and construction works of phase I of the sewerage system in Bijeljina,
    (Investor: Municipality of Bijeljina, 2009-2010)

1 Project implemented by a Consortium with Eptisa Spain, where the Institute for Water Management Ltd. Bijeljina was a member of the consortium