Preliminary and Detailed Designs Improvement of the Left Drina Bank Between the Confluence of the Krizevica and the Confluence of the Glogovska River Including the Construction of Flood Defence Embankment (Institute for Water Management, Bijeljina & CHT Hidropoint, Banja Luka & HEC, Banja Luka, 2020)   The hazard and risk of flooding by the Drina, Krizevica and Glogovska rivers in the project area in the municipality of Bratunac was assessed as high and extremely high according ...
More