ADAPTATION OF THE VALVE CHAMBER AND PUMP STATION WITHIN DOBOJ RESERVOIR-DEVELOPMENT OF THE DETAILED DESIGN OF “RAJCINOVAC” PUMP STATION RECONSTRUCTION-DOBOJ WSS

 

  • Subject of the project was reconstruction of the valve chamber of existing “Rajcinovac” reservoir in Doboj and replacement of the pump aggregate for II and III altitude areas, and lowering the level of the suction for the pumps thus using entire reservoir capacity.
  • Within the construction part of the design the rehabilitation and reconstruction of the structural and other elements of existing pump station and valve chamber objects were designed.
  • Hydro-mechanical part of the design foreseen procurement and installation of the new pump sets.
  • Designing of necessary electro installations was performed within the Electro part.
  • Investor was “Water Utility” a.d. Doboj
  • Deadline for design documentation finalization was April 2019.